$0.13, Market Cap of $30 Million.
Chart

Description
IMPACT Silver Corp. (ISVLF) is a successful producer-explorer with two mining projects in Mexico.
- Royal Mines of Zacualpan Silver-Gold District: IMPACT owns 100% of the 211 km2ย Zacualpan project in central Mexico where four producing underground silver mines and one open pit mine feed the central 500 tpd Guadalupe processing plant. To the south, the Capire Project includes a 200 tpd processing pilot plant adjacent to an open pit silver mine with an NIโฏ43-101 inferred mineral resource of over 4.5โฏmillion ozs silver, 48 million lbs zinc and 21 million lbs lead (see IMPACT news release dated January 18, 2016, for details and QP statement). Company engineers are reviewing Capire for a potential restart of operations to leverage improving commodity prices. Over the past 18 years, IMPACT has developed multiple exploration zones into commercial production and has produced over 13 million ounces of silver, generating revenue of more than $277 million, with no long-term debt.
- Plomosas Zinc-Lead-Silver District:ย Plomosas is a high-grade zinc producer in northern Mexico with exceptional exploration upside potential. The Company recently restarted mining operations and is ramping up production toward design capacity levels. Exploration potential at Plomosas is exceptional along the 6 km-long structure. This is in addition to other exploration targets on the 3,019-hectare property including untested copper-gold targets with indications of high-grade material at surface. Regionally, Plomosas lies in the same mineral belt as some of the largest carbonate replacement deposits in the world.
Recent News
Impact Silver Announces $3.5 Million Non-Brokered Financing with a Lead Order from Strategics Trafigura Pte Ltd. and Palisades Goldcorp Ltd. Newsfile | 04/15/2025
IMPACT Silver Proposes Extension of 2025 Share Warrants Newsfile | 04/04/2025
IMPACT Silver Intersects 597 g/t Silver over 2.77m and 1,460 g/t Silver over 0.55m on Kena Discovery at Guadalupe Mine Newsfile | 02/11/2025
Impact Silver Intersects 14.13% Zinc over 2.2m Including 26.06% Zinc over 0.9m at the Plomosas Mine Newsfile | 01/16/2025
IMPACT Silver Celebrates Growth and Achievement in 2024 Newsfile | 01/08/2025
Presentation

Website

Contacts
“Frederick W. Davidson”
President & CEO
For more information, please contact:
Jerry Huang
CFO | Investor Relations
O: (604) 681 0172 or inquiries@impactsilver.com
C: (778) 887 6489 Direct
Disclaimer
This IMPACT News Release may contain certain “forward-looking” statements and information relating to IMPACT that is based on the beliefs of IMPACT management, as well as assumptions made by and information currently available to IMPACT management. Forward-looking information is often, but not always, identified by the use of words such as “seek”, “anticipate”, “plan”, “continue”, “planned”, “expect”, “project”, “predict”, “potential”, “targeting”, “intends”, “believe”, “potential”, and similar expressions, or describes a “goal”, or variation of such words and phrases or state that certain actions, events or results “may”, “should”, “could”, “would”, “might” or “will” be taken, occur or be achieved. Such statements include, but are not limited to, statements regarding interpretation of drill results, activity at the projects and estimated timing thereof, the potential for defining and extending the known mineralization, exploration potential on the properties, and plans for drilling and future operations at the Company’s projects or plans for financing.
Such forward-looking information involves known and unknown risks and assumptions, including with respect to, without limitation, exploration and development risks, expenditure and financing requirements, title matters, operating hazards, criminal activity, metal prices, political and economic factors, community relations, competitive factors, general economic conditions, relationships with vendors and strategic partners, governmental regulation and supervision, seasonality, technological change, industry practices, pandemics and one-time events. Should any one or more risks or uncertainties materialize or change, or should any underlying assumptions prove incorrect, actual results and forward-looking statements may vary materially from those described herein. IMPACT does not assume the obligation to update any forward-looking statement or beliefs, opinions, projections or other factors, except as required by law.
The Company’s decision to place a mine into production, expand a mine, make other production related decisions or otherwise carry out mining and processing operations, is largely based on internal non-public Company data and reports based on exploration, development and mining work by the Company’s geologists and engineers. The results of this work are evident in the discovery and building of multiple mines for the Company at Zacualpan and in the track record of mineral production and financial returns of the Company since 2006. Under NI 43-101, the Company is required to disclose that it has not based its production decisions on NI 43-101 mineral resources or reserve estimates, preliminary economic assessments or feasibility studies, and historically such projects have increased uncertainty and risk of failure.


